Here’s a short video (about 4 minutes) which was shot at the Nesjavellir Geothermal power plant just outside of Reykjavik, Iceland. The plant is a combined heat and power plant, which means that it produces electricity (120 MW) and hot water for district heating. Most of the preparations, design and project managment of the plant was done by Mannvit Engineering, a leading geothermal engineering company.
Advertisement